Jump to content

Recommended Posts

Posted

Part 15 – Ceiling Planks

 

Hi Everyone.  Again, it has been a while since my last post.  At the end of April my wife went into hospital for some surgery, and we were expecting her to be home in a couple of days.  Unfortunately there were some serious complications that kept her hospitalized for about 10 days, followed by some convalescing at home.  Needless to say modeling activities were put aside during that time.  Fortunately she’s doing well and is getting back to feeling normal.  So, back to work on Kathryn.

 

The ceiling planks are next on the plate.  There’s a lot of interior detail to be worked on, and the ceiling planks need to be completed before any of the other details can be tackled.

 

According to the HAER documentation, ceiling planking runs from the third frame back to frame 20.  This is the area used for some below-deck storage and for forward berthing.  There’s a bulkhead that forms the forward wall of the cabin at frame 20, and the depth of the hull from frame 20 aft is very shallow, so it doesn’t make sense to install ceiling planks aft of frame 20.  However, the photos from the recent reconstruction appear to show ceiling being laid under the cabin.  This photo was taken looking forward – the vertical paneling is actually the forward wall of the cabin, and the bulkhead at the forward end of the cabin has not yet been installed.

 

            591bb621aac9d_146aCeilingplanksfwdwallofcabin.jpg.c69469c21d2fcfdc297f69e8cf3f6ca3.jpg

 

Since this model is intended to depict Kathryn as she was originally built, the ceiling planks will end at frame 20.

 

Kathryn’s ceiling planks are approximately 9” wide x 1-3/4” thick.  Since the plan is for some of the ceiling to be visible, simulated bolts will be installed on the planks.  The process for installing these bolts is the same as used in my Dunbrody build.

 

First, the location of the bolts will be marked on a plank corresponding to the middle of the frame below the plank, except where planks meet in the middle of a frame.

 

            591bb62ca176d_147Markingtheframelocations.thumb.jpg.3f9c69bbb18c9c0d8a7c04225b17eae4.jpg

 

A small square is then used to draw a perpendicular line across the plank.  (Where the plank was being installed on a cant frame, a line matching the angle of the frame was drawn instead.)

 

            591bb63a55d49_148Drawingperpendicularlines.thumb.jpg.a62242528426cbb7c76d44ac1feef924.jpg

 

The Sensitive Drilling Attachment on the milling machine is used to drill the bolt holes.  This drilling setup allows for the holes to be drilled a consistent distance from both edges of the plank.  The plank is pressed against the wood strip, all the holes are drilled, the plank is reversed, and the holes for the other side are drilled.

 

            591bb6438a919_149DrillingSetup.thumb.jpg.12b6276a7dbd99736aafc2c5c8684039.jpg

 

After drilling, the pencil lines are all erased with an artist’s eraser.

 

            591bb651c6d7d_150DrilledPlank.thumb.jpg.ff58b5d4adf924f8c0f29f3d29b73aeb.jpg

 

The bolts are 24 gauge copper wire that has been work hardened and then cut into short ‘rods’.  The holes in the plank have been drilled using a #76 drill.  The rod is fed through the hole and then dipped into a puddle of medium viscosity CA glue.  By feeding the rod through the hole before applying glue, any CA smear is on the bottom of the plank and won’t detract from the finished look of the plank.

 

            591bb65796a24_151ApplyingGlue.thumb.jpg.7060e32855f37068c68d73f2909b7bd8.jpg

 

The plank is then gently pushed down to the surface of a plate glass sheet – this causes the bolt to be set right against the bottom of the plank, so little or no trimming or sanding is needed on the bottom of the plank.

 

            591bb65a9104f_152settingtheboltflush.thumb.jpg.3141d2e74539ea6b78f32e0a913cbb89.jpg

 

After all of the rods have been glued to the plank, the rods are then clipped off on the top side of the plank and filed or sanded smooth – ready for blackening.  Since the bolts are copper rods, Liver of Sulfur is used for blackening.  The following photo shows a plank that is still wet from blackening. 

 

            591bb664207dc_153BlackenedBolts.thumb.jpg.d44a1e9b3eeaca16a83c288d6f425198.jpg

 

I have found that the blackening agent slightly discolors the wood, so a clear water wash is scrubbed onto the entire plank while it is still wet from the LOS solution.

 

            591bb66e89d27_154RinsingofftheLOS.thumb.jpg.567f7a8fbddaaeae58501ed015f6e78e.jpg

 

Planking clamps as used by EdT were used to clamp the ceiling planks in place.

 

            591bb676146ff_155ClampingArrangement.thumb.jpg.df84350098fa94e7446b0ec6ae57fa55.jpg

 

            591bb680222b8_156Clamping.thumb.jpg.4c44098be3d41c6cff465f1d1e34edee.jpg

 

My existing supply of planking clamps consisted of clamps that were narrow enough to fit between the frames, so I made a few wider clamps for Kathryn. 

 

            591bb68b6efc0_157PlankingClamps.thumb.jpg.b1e39a7cb537a15807a1ce91535fb90c.jpg

 

A combination of the old and new clamping planks was used for the ceiling planking.  In some cases I needed to use different types of clamps.  In the following photo a screw clamp is being used on the starboard side, and home-made miniature c-clamps are used for the forward ends of the planks.

 

            591bb692e306c_158DifferentClamps.thumb.jpg.e881f98837cd4566a3485af929593a14.jpg

 

In other cases the temporary ribbands interfered with the screw clamps, so some scrap wood was used to elevate the arm of the clamp.

 

            591bb69c79891_159ClampingArrangements.thumb.jpg.0ca1e81804dc2d4c88db67442f0bb1eb.jpg

 

            591bb6a779fb7_160Clamping.thumb.jpg.80e215df02b544bf6723ab3bd1ccc43f.jpg

 

When the outermost plank was installed an arrangement of the miniature c-clamps was used.

 

            591bb6b036b61_161OutermostPlank.thumb.jpg.db3428a4be3c7870cf99d1f2e3d02f9c.jpg

 

Since frames 3 through 11 are cant frames, the bolting pattern reflects these frames, and I thought it made for a pleasing effect.

 

            591bb6ba15f1b_162BoltPattern.thumb.jpg.56d1534e603b33d15cca5d8aa562626d.jpg

 

The next step is the installation of the ceiling planks along Kathryn’s sides.

 

Thanks everyone!

Posted

you've made a lot of progress since I last looked in.   kind of a silly question,  but why are they called ceiling planks......you walk on it.....it's a floor,  in reality.   very nicely done....looks great :) 

 

glad to hear your admiral is doing better.

I yam wot I yam!

finished builds:
Billings Nordkap 476 / Billings Cux 87 / Billings Mary Ann / Billings AmericA - reissue
Billings Regina - bashed into the Susan A / Andrea Gail 1:20 - semi scratch w/ Billing instructions
M&M Fun Ship - semi scratch build / Gundalow - scratch build / Jeanne D'Arc - Heller
Phylly C & Denny-Zen - the Lobsie twins - bashed & semi scratch dual build

Billing T78 Norden

 

in dry dock:
Billing's Gothenborg 1:100 / Billing's Boulogne Etaples 1:20
Billing's Half Moon 1:40 - some scratch required
Revell U.S.S. United States 1:96 - plastic/ wood modified / Academy Titanic 1:400
Trawler Syborn - semi scratch / Holiday Harbor dual build - semi scratch

Posted

Interesting process on the planking bolts, Frank - and a lovely result.  I've been AWOL from the posts lately, but hope to be catching up soon.

 

Ed

Posted
On 5/16/2017 at 7:53 PM, GuntherMT said:

Beautiful Frank.  Glad to hear that your wife is doing well.

Thanks Brian.  Looking forward to seeing you tomorrow.

 

On 5/16/2017 at 8:11 PM, popeye the sailor said:

you've made a lot of progress since I last looked in.   kind of a silly question,  but why are they called ceiling planks......you walk on it.....it's a floor,  in reality.   very nicely done....looks great :) 

 

glad to hear your admiral is doing better.

Thanks Popeye.  I think the word 'ceiling' is a form of 'sealing' - not sure, but I think I read this somewhere.

 

On 5/17/2017 at 6:17 AM, EdT said:

Interesting process on the planking bolts, Frank - and a lovely result.  I've been AWOL from the posts lately, but hope to be catching up soon.

 

Ed

Thanks Ed.  Yes - I've been missing your Young America posts.

 

On 5/17/2017 at 9:30 AM, HIPEXEC said:

Great deck planks!

Thanks Rich.  Hope you bring your Argus tomorrow.

 

On 5/17/2017 at 5:36 PM, druxey said:

Interesting technique for minimizing CA glue issues with your bolts.

Thanks Druxey.  I stay away from CA except for work like the bolting.

 

9 hours ago, Omega1234 said:

Hey Frank

 

Lovely and precise work, as always.

 

I'm glad to hear that your wife is doing much better!

 

All the best to both of you for the weekend.

 

Cheers

 

Patrick

Thanks Patrick - I appreciate the good wishes.

Posted
1 hour ago, allanyed said:

Frank,

 

Far and away the nicest Skipjack model I have seen.  Great workmanship

 

Allan

Thanks Alan.  I'm enjoying trying to build Kathryn as she was originally built.  Most of the work will eventually be covered up, but we'll know it's there!

Posted

Part 16 – Deck Beams

 

The ceiling in the hold is now completed.  The bottom strake of the side planking required a lot of measuring and trial fitting, due to the sheer of the hold, as can be seen in the following photos.

 

                        591fb090ec775_163CeilingCompleted1.thumb.jpg.d60553da96faf9311e9dae005e81425e.jpg

 

                        591fb09b5b91f_164CeilingCompleted2.thumb.jpg.7ef1341c2edc354332c117f647c89d35.jpg

 

Kathryn’s deck clamps are made of pine (Castello on the model), but there is a reinforcing clamp added in Kathryn’s forward area.  This reinforcing clamp is made of oak (Madrone on the model).  Appropriate lengths of stock were soaked in boiling water and then clamped in position to dry.

 

                        591fb0a493b51_165BendingtheOakClamp.thumb.jpg.683c810993759d6cd97f3af48c7542a8.jpg

 

After these oak clamps had dried they were cut to final length, simulated bolts were added, and the clamps were then glued in place.

 

                        591fb0af90eb0_166OakClamp1.thumb.jpg.a9d270a106a70484784b44de40173145.jpg

 

                        591fb0ba97c89_167OakClamp2.thumb.jpg.776ecf06d6e6325360107b5c204a9b17.jpg

 

There is a lot of interior construction to be done, and the location of much of the interior components is dependent on the location of deck beams, so the next effort is to shape the deck beams.

 

Initially, every deck beam would be made to full length, regardless of whether it is a full length deck beam spanning the breadth of the hull, or it is a half beam located outside of a hatch.  This would allow the half beams to have the correct camber.

 

There was no information in the HAER documentation about Kathryn’s deck camber.  Research showed a general rule of thumb of ¼ inch for each 1 foot of beam.  This results in a camber of 4.2 inches, which was used for the deck beams.

 

The HAER drawing that shows the configuration of the deck beams was printed to scale as an aid in locating the deck beams.  Each beam would be made individually, so the basic drawing of the profile of the deck beam was duplicated an appropriate number of times.

 

The following photo shows the HAER drawing (upper right) and the beams drawing (lower right).

 

                        591fb0c01f5fc_168ReadyforDeckBeams.thumb.jpg.9e761935a41cca0b60f75e8b4e8986c2.jpg

 

The beams drawing was initially printed to paper stock, but I found that when glue was applied the process of laying the drawing on a piece of wood could occasionally deform the drawing and result in a bad beam.  So I printed these drawings on light card stock and this proved very satisfactory.

 

                        591fb0c41c76a_169DeckBeamDrawing.thumb.jpg.19a78f1570932b65b8d8aa44195cbf60.jpg

 

The manufacture of the beams was fairly simple.  After cutting out a single beam from the drawing drawing, school glue was applied to the back of the drawing.

 

                        591fb0cb00b33_170GlueApplied.thumb.jpg.bd4c0456e91e68f85b3bc85dc912de0e.jpg

 

You’ll notice that the glue has a purple hue.  I recently bought a set of glue sticks, and bought this type by accident.  What I discovered is that the color actually helps to see that the glue is applied over the entire surface.  When the glue dries it is completely transparent.  (I later discovered that when the glue is washed off, the moisture causes the glue color to re-appear – this is a real help in making sure all of the glue is removed in the cleaning).

 

The drawing was then glued to a billet of the appropriate thickness.

 

                        591fb0d07bda1_171DrawingGluedtoblank.thumb.jpg.294e4c3ceb00dc18dce2679617bdc925.jpg

 

The bottom of the beam was cut on the scroll saw almost to the line.

 

                        591fb0dd9e6ea_172BottomofBeamCut.thumb.jpg.5b9ea33d7fdbb720f17a4464f1dcee0e.jpg

 

And the spindle sander was used to bring the cut to the line.

 

                        591fb0e3d30a0_173SandingthebottomoftheBeam.thumb.jpg.24de24fc4c493642bc9875610bb0c696.jpg

 

By forming the bottom edge of the beam before working on the top edge, there was plenty of stock to hold during this shaping.

 

The top edge of the beam was then cut on the scroll saw.

 

                        591fb0e9ab8b3_174TopofBeamCut.thumb.jpg.3177944f2451c5db7623b9c284e30b21.jpg

 

The top edge was then sanded to the line on the disk sander.

 

                        591fb0ee06650_175SandingTopofBeam.thumb.jpg.6a856cd75dea0f9798fc04f85f1bba61.jpg

 

Using the centerline of the drawing as a reference, the centerline was drawn on the top edge of the beam using a small square.

 

                        591fb0fd7df91_176MarkingtheCenterofBeam.thumb.jpg.1fc20f458f02086ba699f29addb8b022.jpg

 

This was a fairly straight-forward process, and I was able to manufacture the required 24 beams in an afternoon.  You'll notice that there are 4 beams in Kathryn's center that are darker in color.  All of the deck beams are pine (Castello on the model) except the four beams that are located under the dredging winder.  Those beams are oak (Madrone on the model) - so there's a difference in color.

 

                        591fb10595632_177AllBeamsCompleted.thumb.jpg.a55fecc1344dc996e1a1907c484552e5.jpg

 

I’ll probably make a few more beams as backups.  These beams won’t be installed until the appropriate time – when an interior component depending on the placement of a beam is being installed.

 

Thanks everyone!

Posted

Hi Frank -

 

What a lot of great work has been done since I looked in.  Very precise and clean.  This promises to be an excellent model.

 

One small suggestion.  For the ceiling planks it does not matter so much, but when you go to show treenails or bolts in the hull or deck planking, you should stagger the two for each plank diagonally left and right along the beam or frame.  Putting them in a straight line puts the line of weakness from the holes and the line of strain from the bolts all along the same grain line in the wood.  This would increase the danger of splitting along that line.   I've never seen it done that way except in ships with wooden decks over a steel framework.

 

Of course, if your excellent and thorough research and photos shows otherwise, I am fully prepared to be wrong.

 

Be well

 

Dan

 

Current build -Khufu solar barge, c. 2,560 BCE, a cross-section model at 1:10 scale

 

Prior scratch builds - Royal yacht Henrietta, USS Monitor, USS Maine, HMS Pelican, SS America, SS Rex, SS Uruguay, Viking knarr, Gokstad ship, Thames River Skiff , USS OneidaSwan 42 racing yacht  Queen Anne's Revenge (1710) SS Andrea Doria (1952), SS Michelangelo (1962) , Queen Anne's Revenge (2nd model) USS/SS Leviathan (1914),  James B Colgate (1892),  POW bone model (circa 1800) restoration,  SS Mayaguez (c.1975)

 

Prior kit builds - AL Dallas, Mamoli Bounty. Bluejacket America, North River Diligence, Airfix Sovereign of the Seas

 

"Take big bites.  Moderation is for monks."  Robert A. Heinlein

 

 

Posted
9 hours ago, shipmodel said:

Hi Frank -

 

What a lot of great work has been done since I looked in.  Very precise and clean.  This promises to be an excellent model.

 

One small suggestion.  For the ceiling planks it does not matter so much, but when you go to show treenails or bolts in the hull or deck planking, you should stagger the two for each plank diagonally left and right along the beam or frame.  Putting them in a straight line puts the line of weakness from the holes and the line of strain from the bolts all along the same grain line in the wood.  This would increase the danger of splitting along that line.   I've never seen it done that way except in ships with wooden decks over a steel framework.

 

Of course, if your excellent and thorough research and photos shows otherwise, I am fully prepared to be wrong.

 

Be well

 

Dan

 

 

Hi Dan - thanks for the comments.  Your point on positioning the bolts is interesting.  I hadn't thought of this, so I checked some photos of Kathryn's recent reconstruction, and this confirmed your comment.  Even though the frames are only 4 inches wide the bolts are staggered slightly.  I don't think at this point I'll try to correct the bolting pattern - that would mean starting over!  Very little of the interior work will show on the finished model, and all of the exterior will be painted so I won't be doing much simulated bolting on the exterior.

 

Thanks very much for pointing this out.  When (if) I do another model this way I'll certainly plan to do it correctly.

Posted
On 5/20/2017 at 9:45 AM, druxey said:

Paper patterns won't distort if the adhesive does not contain water. I use rubber cement (a thin coat on each surface, allow to dry and press together). 

Thanks Druxey.  I've tried rubber cement, but prefer glue sticks.

 

On 5/20/2017 at 1:32 PM, GuntherMT said:

It was great seeing the Kathryn in person today (as well as you lovely wife).  Thanks for hosting again, and look forward to more of your fine work on this model.

Thanks Brian - our meetings are always interesting.  And they make me clean the shop at least once a month!

Posted

Part 17 – Installing the Deck Beams

 

The next step is to install the deck beams.  The stern appears to be too high, and this was confirmed by test fitting the rearmost deck beams.  Before proceeding with the deck beam installation, the stern was removed and refitted.

 

Two deck beams were temporarily clamped in place, and two deck planks were attached using wire ties.  Two bottom planks were also wire tied to the frames.  These planks were used to ensure that the stern timbers were set at the correct height and angle, and then the stern was glued back in place.

 

                        5928e81909288_178FixtheStern1.thumb.jpg.6773617e67f5d360ad5befc2f9ee217a.jpg

 

                        5928e821b99d5_179FixtheStern2.thumb.jpg.faa1de91c1708b0c22e6ddaf2561770f.jpg

 

The view of the deck beam layout from the HAER drawings was printed at the correct scale, and was used as a guide for the installation of the deck beams.

 

                        5928e8383e77b_180DeckBeamsfromHAER.thumb.jpg.e05f7440a97857e0d9b3fd40c97a7d15.jpg

 

As a preliminary check, all deck beams were laid in the appropriate locations.  It became clear that some of the frames would need to be trimmed back to the height of the clamp, since some of the deck beams would be in the same location as the frames.

 

                        5928e83fd6c21_181DeckBeamslaidout.thumb.jpg.80066a6a5d133a6bcaa4d72556f6192c.jpg

 

Some of the beam locations are critical, since they determine the location and rake of some components.  The first of these is Beam 2, which supports the Sampson Post.  The Sampson Post, made of oak, is 5” thick, and tapers from a 5” width at the keelson to 1’-2” at deck height.  Above the deck it is consistently 1’-2” in width.

 

                        5928e84310393_182SampsonPostandBeam.thumb.jpg.0477f545ce437f47f6713d4bb9e93c52.jpg

 

Deck Beams are glued to the clamp, but are also strengthened by functional bolts made of 1/32” brass rods that tie the beam to the clamp.  Deck Beam installation consists of

1.    Locating the beam along the clamp

2.    Centering the beam by aligning the centerline drawn on the beam with the centerline thread

3.    Locating and drilling the holes for the brass rod through the beam and into the clamp.

4.    Glueing the beam to the clamp with PVA glue

5.    Glueing the functional bolts using medium-viscosity CA glue

6.    Trimming (fairing) the beam ends

The initial deck beam (Beam #2) is being glued in place.

 

                        5928e84d0b27d_183GlueingtheFirstDeckBeam.thumb.jpg.ae03c67ce27338c4f92397511c10da8d.jpg

 

It was then bolted and faired, as in the following photo of a later beam being faired.

 

                       5928e85848643_183AFairingtheBeam.thumb.jpg.db700843ee3660415db12d5b0edaf276.jpg

 

The Sampson Post was then tacked in place.  It was not permanently installed at this time since there was still an open question on the Sampson Post – which will be discussed in a later post.

 

                        5928e8624d0a6_184tackingtheSampsonPostinPlace.thumb.jpg.28394f940e0fe2ab49f512d9b1aa6b43.jpg

 

                        5928e869eb7fa_185SampsonPost.thumb.jpg.acf10d6b255253f3acc5eb0d3fe61aa7.jpg

 

                        5928e873d182f_186SampsonPost2.thumb.jpg.365591f458f5eaea9925501797e32246.jpg

 

When Beam #2 was completed, Beam #1 was installed approximately halfway between #2 and the stem.

 

                        5928e87eb54ed_187InstallingthesecondBeam.thumb.jpg.6918f09d77873028c762a2b75035f649.jpg

 

The next critical beam was the forward-most of the beams adjacent to the mast (Beams #4 and #5), so Beam #3 was installed at the nearest frame.  The following photo shows the first three beams permanently installed, with Beams #4 and #5 held in place temporarily be brass rods.

 

                        5928e88aa0fad_188BeamsTemporarilyplaced.thumb.jpg.02226fce39ef74356e32b2c5c2f843e4.jpg

 

A stub mast was used to verify the placement of beams #4 and #5

 

                        5928e894ee9bb_189MastStub.thumb.jpg.161e0d63e2383a0b7e7026e6e33257e5.jpg

 

The stub was left as an octagonal since the full mast will remain octagonal when it goes through the deck to the keelson.  Details on the construction of the mast will be provided when the full mast is described in a later post.

 

The next post will address the construction of the beams for the forward hatch, the Centerboard Trunk, and revisions to the Sampson Post.

 

Thanks Everyone!

 

Posted
47 minutes ago, Omega1234 said:

Hi Frank

 

Very impressive!  A couple of quick questions-Firstly, a stupid one - What does HAER stand for?  Secondly, will you paint the woodwork, or leave it oiled/varnished?

 

Have a great weekend!

 

Cheers

 

Patrick

Hi Patrick - always great to hear from you.

 

The only stupid question is the one that wasn't asked.  ;)

 

HAER stands for Historic American Engineering Record, which is a service from the Library of Congress.  It contains detailed surveys on a large number of topics - nautical information is only a part.  The documentation on Kathryn includes 8 pages of drawings that resulted from a survey performed in the mid-90's (available as JPG's or high-density TIFF files) as well as a number of actual photographs and the documentation supporting Kathryn's nomination as a National Historic Landmark.  Here's a link to the section on Kathryn, in case you'd like to see the details.

 

http://www.loc.gov/pictures/collection/hh/item/md1454/

 

I plan to paint Kathryn's exterior (she's mostly white above the waterline), and to leave the interior natural (will probably put on some wipe-on poly to preserve it).  The interior of the cabin seems to be stained, so I'll try to emulate that.  Most of the interior work will be covered up - I'll probably leave the hatch covers off and maybe a few deck planks and I'm thinking of making the cabin roof removable, but the interior work is mostly for my enjoyment and will only be seen in photos once I'm done.  I do plan to put a little lighting belowdecks but I'm not sure how much it will show.

 

All the best,

 

 

Posted
On 17.5.2017 at 4:39 AM, Mahuna said:

 

Part 15 – Ceiling Planks

 

Hi Everyone.  Again, it has been a while since my last post.  At the end of April my wife went into hospital for some surgery, and we were expecting her to be home in a couple of days.  Unfortunately there were some serious complications that kept her hospitalized for about 10 days, followed by some convalescing at home.  Needless to say modeling activities were put aside during that time.  Fortunately she’s doing well and is getting back to feeling normal.  So, back to work on Kathryn.

 

The ceiling planks are next on the plate.  There’s a lot of interior detail to be worked on, and the ceiling planks need to be completed before any of the other details can be tackled.

 

According to the HAER documentation, ceiling planking runs from the third frame back to frame 20.  This is the area used for some below-deck storage and for forward berthing.  There’s a bulkhead that forms the forward wall of the cabin at frame 20, and the depth of the hull from frame 20 aft is very shallow, so it doesn’t make sense to install ceiling planks aft of frame 20.  However, the photos from the recent reconstruction appear to show ceiling being laid under the cabin.  This photo was taken looking forward – the vertical paneling is actually the forward wall of the cabin, and the bulkhead at the forward end of the cabin has not yet been installed.

 

            591bb621aac9d_146aCeilingplanksfwdwallofcabin.jpg.c69469c21d2fcfdc297f69e8cf3f6ca3.jpg

 

Since this model is intended to depict Kathryn as she was originally built, the ceiling planks will end at frame 20.

 

Kathryn’s ceiling planks are approximately 9” wide x 1-3/4” thick.  Since the plan is for some of the ceiling to be visible, simulated bolts will be installed on the planks.  The process for installing these bolts is the same as used in my Dunbrody build.

 

First, the location of the bolts will be marked on a plank corresponding to the middle of the frame below the plank, except where planks meet in the middle of a frame.

 

            591bb62ca176d_147Markingtheframelocations.thumb.jpg.3f9c69bbb18c9c0d8a7c04225b17eae4.jpg

 

A small square is then used to draw a perpendicular line across the plank.  (Where the plank was being installed on a cant frame, a line matching the angle of the frame was drawn instead.)

 

            591bb63a55d49_148Drawingperpendicularlines.thumb.jpg.a62242528426cbb7c76d44ac1feef924.jpg

 

The Sensitive Drilling Attachment on the milling machine is used to drill the bolt holes.  This drilling setup allows for the holes to be drilled a consistent distance from both edges of the plank.  The plank is pressed against the wood strip, all the holes are drilled, the plank is reversed, and the holes for the other side are drilled.

 

            591bb6438a919_149DrillingSetup.thumb.jpg.12b6276a7dbd99736aafc2c5c8684039.jpg

 

After drilling, the pencil lines are all erased with an artist’s eraser.

 

            591bb651c6d7d_150DrilledPlank.thumb.jpg.ff58b5d4adf924f8c0f29f3d29b73aeb.jpg

 

The bolts are 24 gauge copper wire that has been work hardened and then cut into short ‘rods’.  The holes in the plank have been drilled using a #76 drill.  The rod is fed through the hole and then dipped into a puddle of medium viscosity CA glue.  By feeding the rod through the hole before applying glue, any CA smear is on the bottom of the plank and won’t detract from the finished look of the plank.

 

            591bb65796a24_151ApplyingGlue.thumb.jpg.7060e32855f37068c68d73f2909b7bd8.jpg

 

The plank is then gently pushed down to the surface of a plate glass sheet – this causes the bolt to be set right against the bottom of the plank, so little or no trimming or sanding is needed on the bottom of the plank.

 

            591bb65a9104f_152settingtheboltflush.thumb.jpg.3141d2e74539ea6b78f32e0a913cbb89.jpg

 

After all of the rods have been glued to the plank, the rods are then clipped off on the top side of the plank and filed or sanded smooth – ready for blackening.  Since the bolts are copper rods, Liver of Sulfur is used for blackening.  The following photo shows a plank that is still wet from blackening. 

 

            591bb664207dc_153BlackenedBolts.thumb.jpg.d44a1e9b3eeaca16a83c288d6f425198.jpg

 

I have found that the blackening agent slightly discolors the wood, so a clear water wash is scrubbed onto the entire plank while it is still wet from the LOS solution.

 

            591bb66e89d27_154RinsingofftheLOS.thumb.jpg.567f7a8fbddaaeae58501ed015f6e78e.jpg

 

Planking clamps as used by EdT were used to clamp the ceiling planks in place.

 

            591bb676146ff_155ClampingArrangement.thumb.jpg.df84350098fa94e7446b0ec6ae57fa55.jpg

 

            591bb680222b8_156Clamping.thumb.jpg.4c44098be3d41c6cff465f1d1e34edee.jpg

 

My existing supply of planking clamps consisted of clamps that were narrow enough to fit between the frames, so I made a few wider clamps for Kathryn. 

 

            591bb68b6efc0_157PlankingClamps.thumb.jpg.b1e39a7cb537a15807a1ce91535fb90c.jpg

 

A combination of the old and new clamping planks was used for the ceiling planking.  In some cases I needed to use different types of clamps.  In the following photo a screw clamp is being used on the starboard side, and home-made miniature c-clamps are used for the forward ends of the planks.

 

            591bb692e306c_158DifferentClamps.thumb.jpg.e881f98837cd4566a3485af929593a14.jpg

 

In other cases the temporary ribbands interfered with the screw clamps, so some scrap wood was used to elevate the arm of the clamp.

 

            591bb69c79891_159ClampingArrangements.thumb.jpg.0ca1e81804dc2d4c88db67442f0bb1eb.jpg

 

            591bb6a779fb7_160Clamping.thumb.jpg.80e215df02b544bf6723ab3bd1ccc43f.jpg

 

When the outermost plank was installed an arrangement of the miniature c-clamps was used.

 

            591bb6b036b61_161OutermostPlank.thumb.jpg.db3428a4be3c7870cf99d1f2e3d02f9c.jpg

 

Since frames 3 through 11 are cant frames, the bolting pattern reflects these frames, and I thought it made for a pleasing effect.

 

            591bb6ba15f1b_162BoltPattern.thumb.jpg.56d1534e603b33d15cca5d8aa562626d.jpg

 

The next step is the installation of the ceiling planks along Kathryn’s sides.

 

Thanks everyone!

 

Very nice work Frank,

 

your framing and joining looks excellent.   :)

Will that centerboard later on be swivable with a pivot point ?

 

Nils

Current builds

-Lightship Elbe 1

Completed

- Steamship Ergenstrasse ex Laker Corsicana 1918- scale 1:87 scratchbuild

"Zeesboot"  heritage wooden fishing small craft around 1870, POB  clinker scratch build scale 1:24

Pilot Schooner # 5 ELBE  ex Wanderbird, scale 1:50 scratchbuild

Mississippi Sterwheelsteamer built as christmapresent for grandson modified kit build

Chebec "Eagle of Algier" 1753--scale 1:48-POB-(scratchbuild) 

"SS Kaiser Wilhelm der Grosse" four stacker passenger liner of 1897, blue ribbond awarded, 1:144 (scratchbuild)
"HMS Pegasus" , 16 gun sloop, Swan-Class 1776-1777 scale 1:64 from Amati plan 

-"Pamir" 4-mast barque, P-liner, 1:96  (scratchbuild)

-"Gorch Fock 2" German Navy cadet training 3-mast barque, 1:95 (scratchbuild) 

"Heinrich Kayser" heritage Merchant Steamship, 1:96 (scratchbuild)  original was my grandfathers ship

-"Bohuslän" , heritage ,live Swedish museum passenger steamer (Billings kit), 1:50 

"Lorbas", river tug, steam driven for RC, fictive design (scratchbuild), scale appr. 1:32

under restoration / restoration finished 

"Hjejlen" steam paddlewheeler, 1861, Billings Boats rare old kit, scale 1:50

Posted

Part 18 – Installing the Deck Beams, cont’d

 

 

The placement of the four deck beams associated with the forward hatch is critical not only for that hatch, but for the centerboard trunk and the forward bulkhead.  The forward-most of these beams is located approximately a third of the way back from the front face of the centerboard trunk, and the forward bulkhead is secured to this beam.  The bulkhead also dictates the placement of the two berths in Kathryn’s bow.

 

 The first and last of the deck beams were milled to accept the headers that define the sides of the hatch.

 

                        592a3f54c2ed0_190FwdHatchBeams.thumb.jpg.6fb9f00f54e2111c4c513814ba1fbc7d.jpg

 

A billet was then dimensioned to provide a tight joint between the beam and the header width, and then the billet was cut to provide enough stock for the appropriate number of Kathryn’s headers.

 

                        592a3f5a0e293_191TightJoint.thumb.jpg.e0594ef8d48a07606c26504edc6d00eb.jpg

 

The headers for the forward hatch were milled to accept the half beams, and then were glued to the two full deck beams for the hatch.

 

                        592a3f67dd221_192GlueingtheHatchBeams.thumb.jpg.b20b6feec8393a66e13e0caf30997622.jpg

 

This configuration was then temporarily installed.  As can be seen in the following photos, the rearmost beam fell in the same location as a frame, so the top of the frame was trimmed back to clamp height.

 

                        592a3f72ea36d_193hatchBeamstempinstalled.thumb.jpg.ea1ae15f536fd94b0954cc47fbac36f2.jpg

 

                        592a3f7dc7c55_194Hatchbeams2.thumb.jpg.68c000ebc475b02def22e0d35136f727.jpg

 

                        592a3f886cf42_195HatchBeams3.thumb.jpg.914ff51c2c198ed13f4868a61ea1f261.jpg

 

Battens to support the bottom of the bulkhead were installed directly below the forward beam of the hatch.

 

                        592a3f938da6c_196Bulkheadbattens.thumb.jpg.f0430518177db0467f5ac1f310718240.jpg

 

The Centerboard Trunk was then constructed based on the following drawing (adapted from the HAER drawings)

 

                        592a3f94bdad0_197KathrynCenterboardandTrunk.thumb.jpg.a500ed1da8578e1cdfc3ef1751ceba80.jpg

 

The side planks for the trunk’s two sides were edge glued, clamped to a piece of plate glass to ensure that they remained flat.  When the glue joining the initial two planks cured, another plank was added, and then another as the fourth and last plank for the side.  The process was repeated for both sides of the trunk.

 

                        592a3f9cc9f64_198EdgeGlueingthetrunkplanks.thumb.jpg.943e4a61ae1d245b2f05f2ea2486a363.jpg

 

The two sides were then were marked for cutting using the trunk drawing on a piece of card stock.

 

                        592a3fa389aec_199TrunkPlanksReady.thumb.jpg.5c4ed2b04952853b6328276e9ad94e93.jpg

 

The end posts of the trunk were cut from a piece of stock, based on the bolt configuration shown in the HAER drawing.  The small tabs seen on the bottom of the posts were left to ensure proper location of the trunk related to the centerboard slot.

 

                        592a3faa46a7a_200CenterboardTrunkComponents.thumb.jpg.7a3250e1be12c872ce050a38272d4292.jpg

 

The centerboard of a skipjack is fitted so that, when hauled up, they extend some distance below the keel, but if an obstruction is hit, the board can rise in the trunk.  In order to allow this, the centerboard and has a slanting slot rather than a hole for the pivot bolt.

 

The following photo shows the centerboard (without mounting hardware) and the trunk fully assembled.

 

                        592a3fb33f6f1_200ACenterboardandTrunk.thumb.jpg.c18c8c651d7dbceed0c1a67e6bf35850.jpg

 

The following photos show the centerboard and trunk temporarily in place.

 

                        592a3fbe40768_200BCenterboardinplace.thumb.jpg.2cc824027a781d5d2f89f13e90693309.jpg

 

                        592a3fc966615_200CTrunkinPlace.thumb.jpg.65c14d4f3dc09e833a47a62ca4737151.jpg

 

                        592a3fd4899d2_200DTrunk.thumb.jpg.ac6934e12871f04facc2525c4ced93af.jpg

 

The hatch beams were temporarily installed to check the height of the trunk.  Some minimal shaping was required for a proper fit.

 

                        592a3fdf3562c_200EHatchDeckBeams.thumb.jpg.94dffc956abd6c6fba44f6b9d68f598f.jpg

 

                        592a3fea2cbf2_201TrunkTempinPlace.thumb.jpg.65f87c8783f61143ca23dde511baac60.jpg

 

The Sampson Post shown in the prior post had a flat forward face.  I was unable to find any clear photos of how the end of the bowsprit fitted against the Sampson Post.  However, when a bowsprit butts against a single Sampson Post, I believe it’s normal to have a mortise cut in the face of the post and for a small tenon to be cut into the rear of the bowsprit – ensuring a tight fit that will not allow the bowsprit to shift.

 

I decided to cut a 4-inch wide mortise into the Sampson post, beginning approximately 1 inch above deck height.  The mortise would mate with a 4-inch square tenon on the bowsprit, and the mortise height of 6 inches would allow some flexibility in setting the angle of the bowsprit.

 

The mortise was cut using a 1/8” chisel.

 

                        592a3feeba331_202CuttingtheSampsonMortise.thumb.jpg.1dd16c31d3031b1f4fee5691d4ce5d95.jpg

 

                        592a3ff33df8d_203SampsonPostReady.thumb.jpg.849d527d9d987b66564b8b04424bb7c2.jpg

 

The Sampson Post was then glued in place.

 

                        592a3ffddbaa2_204SampsonPost1.thumb.jpg.2dbbfa81f0f1c6069982bf1881890a4b.jpg

 

This brings us to where Kathryn stands today.

 

                        592a400839f31_205CurrentStatus.thumb.jpg.0fd20a911d892353663125d129ff9983.jpg

 

The centerboard will need to be painted before it can be installed, since removing it for painting later in the build will not be possible.  I’m trying to find an appropriate color to use as anti-fouling red.  A friend who has built many Chesapeake Bay workboat models recommends the use of Liquitex Burnt Sienna – I’m going to give it a try.

 

Thanks everyone!

 

Posted
12 hours ago, PETERPETER said:

It's always a pleasure to see your work and the speed with which you move ahead with logical, well planned steps.

Peter

Hi Peter - thanks for looking in.  I've been able to put in some good shop time lately, so work is progressing well.

Posted

Part 19 – Installing the Centerboard

 

At the end of the last post, I mentioned that the centerboard needed to be painted before it could be installed.  Some other work was also needed prior to installation.

 

The centerboard is held in the trunk by a pivot bolt.  In some cases this is a wooden bolt, but the HAER drawings seem to show a nut on a metal bolt.  In order to model this a 1/32 brass rod was used as the bolt, and a corresponding nut was made by filing the outside of a brass tube until it was square.  The interior diameter of the tube is 1/32, so it made a good fit after a small piece was parted off and used as a nut.

 

                        592cea10d8260_206SimulatedBolt.thumb.jpg.aca2584b1898632d3f805739f4341ae7.jpg

 

The nut was CA glued in place, since cutting a thread that small is beyond what I wanted to do.

 

The interior of the hull will be seen through a very small hatch, so a small LED light at the front of the centerboard trunk will help to show the detail.  The rear hatch will also be open, so an LED at the rear of the trunk will also help.  A piece of reflective chrome tape was attached at the front and rear of the centerboard trunk where these LED’s will be positioned.

 

                        592cea1aabe68_207ReflectiveStrip.thumb.jpg.f3b95af4dc73899117900995d13864b3.jpg

 

The wires from the LED’s exit the trunk through holes drilled in the port side.

 

                        592cea240f3ba_208Trunkpre-wired.thumb.jpg.3984111d184961dd9842720c3f84f0f6.jpg

 

The centerboard was painted, and a ringbolt for the hauling lanyard was installed at the rear of the centerboard.  Similarly, a ringbolt was installed on the forward end of the centerboard.  The forward ringbolt is only used when the skipjack is hauled out of the water and the centerboard is removed.  Chappelle, in American Small Sailing Craft, gives a good description of how the centerboard is managed during that work.

 

A hauling lanyard was attached to the rear ringbolt.  I’m not sure if I will actually run the lanyard to its end location at the captain’s position, but the lanyard will be there in case I decide to do so.

 

The following photo shows the finished centerboard.  Not much, if any, of the detail will show in the finished model, but my enjoyment comes more from the building process than the appearance of the finished model.

 

                        592cea2c1d430_209CenterboardCompleted.thumb.jpg.ff236932f885caf9b382d228b71aec66.jpg

 

So now the centerboard and trunk has been installed, the wires for the LED’s have been run through holes bored in two frames for that purpose, and the wires have been attached to a connector for later installations.

 

                        592cea3873d7c_210CenterboardandTrunkINstalled.thumb.jpg.f954adc6d163f454f539859f2782b744.jpg

 

I’ve never worked with LED lighting before this, but I was able to find a web site that provides a wide range of pre-wired components that makes the job very easy. 

 

http://www.modeltrainsoftware.com/ledlights1.html

 

Now that the centerboard trunk and the deck beams for the forward hatch are in place, the next work is to install the forward bulkhead and the forward berths.

 

Thanks everyone, and Happy Memorial Day.

 

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...