Jump to content

Mirabell61

Members
  • Posts

    7,418
  • Joined

  • Last visited

Everything posted by Mirabell61

  1. build log part 24 Preparing for the captains Launch (Pinasse 9,2m ) the Yards have to allow bracing to utmost Position before they touch the backstays checking alignment through topgallant platform before the final backstays are set the boats Derrick attached to the mainmast the mizzenmast bears no yards have the most masting parts done... the ventflaps for the scupper openings are attached my master raft Containment template for moulding the semi halves BUild log part 25 to follow.... Nils
  2. build log part 23 Here the mizzen mast unpainted.... hooters, Radar station lower platform antenna top antenna Mast top middle gaff boom bearing set of masts, yards Build log part 24 to follow.... Nils
  3. Build log part 22 the pinrails are removable for Access to the eyelets (shrouds and backstays fastening)in between mizzem mast pinrail, the nameplates are aside the poopdeck and at stern bowsprit netting swivible bumpkins for bracing tackle rope guides the tack Position of the Forward mast lower yard Build log part 23 to follow.... Nils
  4. I admire your skills Alexander, Great work ! Nils
  5. Spitzenklasse Drazen, I love your work on this great model, a delight to watch her grow... Nils
  6. Ed and David, Thanks to both of you for your comments Nils
  7. build log part 21 variety of Yards in different completion stages view skywards jib boom rigging done without figurehead Albatros at its place side hull bumpkins for bracing tackle bulwark bolts to be cut and nuts and washers to be painted white Build log part 22 to follow..... Nils
  8. Build log part 20 scetch for Yard / block tackle at mast preparing for soldering jackstays to the lower yard on the next model I would`nt do the footrope (horses) holders this way, They would touch the yard tangentialy from the Yard aft side, and be attached to the second jackstay row checking the Yard swiviling capability the geometry of the yardracks must allow a Close as possible Position of the leeward yardend to the shrouds when full braced startig jib boom tackle and safety netting the solid bobstays are from brass wire the Albatros figurehead is attached removable Build log part 21 to follow... Nils
  9. Build log part 19 scetche for rigging mainmast and for foremast scetch for Yard (one of many) impressions for masts and Yards after painting Build log part 20 to follow.... Nils
  10. Lou, fortunately having a digital camera at Hand for some years already, it was possible to document the building sequences for three ships one by one, and this long before I knew of this MSW Forum. Now I am very happy to share my experience with others, before the pics lay idle in the files "drawers" of my PC. Nils
  11. Hi Fabius, Looks like greater experimental toxic mixes you are composing. I can firmly feel the toxic vapours coming in my nose as I read your lines. But it Looks great. Trust you shall be using all necessary protection measures for your health and safety. The more I read and see about oxidizing the copper the more I am thinking about doing so on my Pegasus hull as well. It provides that nice dry dock hull apeal after serving several years in the salty ocean Nils
  12. David, the masts,yards gaff booms, and jib boom after cleaning and primering are painted with water soluble acrylic Basis paint (Color RAL 1017 Safran yellow), the parts get White tipped Ends Nils
  13. very nicely built ship Martin, I love your Detail to the rigging, Looks great. Hope that you have received your rudder pedestals by now, would like to see them mounted.... Nils
  14. Build log part 18 foremast one of the two main lower Yards with twinjackstays attached Yard mounted to its place Stern decoration with nameplate, and hometown badge (Kiel) Build log part 19 to follow.... Nils
  15. Build log part 17 getting all the eyelets soldered on stations for hight-fixed and vertical-moveable yards underside of topgallant platform masttop and slide rail for royal-yard underside of lower top platform Radar Station protection Cage on foremast fog horn within protection as well Build log part 18 to follow.... Nils
  16. Build log part 16 roller for Yard hoisting / lowering chain (in mid mast) bulls eyes inserted checking mast angles and alignment Fitting for taking up the chainplate (anchoring for the lower top shrouds) top spars with access- ladder and devices for antenna and nav light attachments belaying Points in deck area Build log part 17 to follow.... Nils
  17. Very, very fine work Bob, I love the Details and the accuracy you put into your woodwork Nils
  18. Thank you Bob I would`nt dare modeling my HMS Pegasus or any other 18th century ship with brass masts and -Yards.... Nils
  19. Gatean, I love that build of yours, great skilled handcraft work ! Nils
  20. Popeye, when I started using brass I took the following Advantages out of it... - tapering done by staggering appr. tube diam. (no endless taper-sanding etc.) - soldering provides stronger joining than wooden equivelant - to my experience with the rigging it is quicker than with Wooden parts - as I am using wire chord for the static rig, I can set shrouds, stays backstays, etc. well stiff without distorting the masts, when stays and backstays-stresses are equally balanced - a disadvantage would be the weight compared with wood, but that is not relevant for a stand model that is put on a stabil stand. I pay much Attention for securing the standbolts (removable but safely) to the model Nils
  21. Build log part 15 togallant platforms Connection to cap and spars (on the two mainmasts) alignment checks before soldering parts together the lower top is moved to the correct Position, then secured with a pin to the mast Mast rail shoe that goes to the appropriate yardrack set of uncompleted masts and jib boom some paint touch ups done, now ready for inserting portholes (bulls eyes) Build log part 16 to follow.... Nils
  22. beautiful work Jan, a pleasure to see this model in Progress Well done ! Nils
  23. Build log part 14 Starting to do parts of the masts plattforms for the lower tops (multifold soldering Piece) These will be slipped on to the mast and later secured in Position by a pin handrails at rearside of plattforms chocolate Brown Color at poop and forecastle upper portions anchorchain portholes mounted other porthole openings drilled but no inserts yet White paint on... Build log part 15 to follow.... Nils
  24. Build log part 13 Time to get primer and paint started... dull White resin based primer is brushed on the rudder has been plated as well, but the prop is too small in diam. found this one at a web-shop, and modified it a bit, cut off the eye and drill a M3 thread into the hub figure is 1:87 (H0) scale) here and the next pics the White Portion is only primered Build log part 14 to follow.... Nils
×
×
  • Create New...