Jump to content

HMS Sphinx 1775 by Glenn-UK - FINISHED - Vanguard Models - 1:64 - V2 Kit by Glenn Shelton


Recommended Posts

8 More Cannon Built, 8 more left to build

The various wooden cannon parts were removed from the wooden sheet, along with the remaining hanging knees. I have already primed and painted all the PE parts which will be cut from the PE sheets when required to be added.

 

001.thumb.JPG.c8cd87132402c818290a05b306ec8991.JPG

 

With regard to the wheels I had a light bulb moment to remove the laser char. I placed some cannon wheels on a metal rod and wrapped some tape on either side to keep the wheels in place. I then used my rotary (dremel like) tool with a sanding head fitted. When the rotating head was placed on the wheels they spun around and the laser char was removed. The wheel retained their circular shape. It is not a perfect method but it is so much better and quicker compared with using a sanding sticks and sandpaper.

002.thumb.JPG.99e06871c7f3cddb2dab84772aa152c8.JPG

 

The next task was to remove the laser char from the various edges of the cannon sides and hanging knees. I used a narrow Florry sanding stick for this task.

003.thumb.JPG.3344577d0d66d9d5a80d4b1f6efcac4f.JPG

 

It was then time to paint the cannon parts and the hanging knees. The following photo was taken after the first coat of paint had been applied. Once the paint had dried I did apply a second coat.

004.thumb.JPG.1a070e3e71f9be071dd2ee557f43be67.JPG

 

Using some 2mm tape the cannons were masked so the integral end caps could be painted black.

005.thumb.JPG.5144e0e5b9bedfefb882e0d4e7b511e0.JPG

 

With all the wooden parts prepared the basic cannon frames were assembled. The two axles were glued to the left hand side. Once the glue had time to grip the cannon was added, checking the emblem was face up.The right hand cannon side was then glued in place.

006.thumb.JPG.fa610f68aa05037f493cc514551a6474.JPG

 

Once I had allowed time for the glue to cure the eyebolts and cross beam PE parts, the wooded quoins and wheels were added to complete the task.

007.thumb.JPG.16020d16b5f5be62ec9ed717e2066e39.JPG

 

008.thumb.JPG.5208d28bfe9fe0f91fb708804127e841.JPG

 

To finish of this post I dry fitted the completed cannons to the gun deck. I did start to sand the bottom edge of the coamings so they follow the curve of the gundeck for a better fit, a little bit more is still required.

009.thumb.JPG.2577b6d0c2900b3ee579de2030eeb525.JPG

 

The cannons are ready to fire a broadside when required. I must remember to paint the top side step blue and bottom two side steps black.

010.thumb.JPG.a6b973a83ab34c25d3af0594ff4846e6.JPG

Glenn (UK)

Link to comment
Share on other sites

10 minutes ago, glennard2523 said:

With regard to the wheels I had a light bulb moment to remove the laser char.

I wish you had asked last summer..

 

Edited by Gregory

“Indecision may or may not be my problem.”
― Jimmy Buffett

Current builds:    Rattlesnake

On Hold:  HMS Resolution ( AKA Ferrett )

In the Gallery: Yacht Mary,  Gretel, French Cannon

Link to comment
Share on other sites

Deck Items Work In Progres.

When working on the V1 build I did find fitting the walkway hanging knees after the deck items had been installed a little troublesome. Therefore I will fit the knees before the deck items have been fitted. The various knees have been removed from the wooden sheet and the laser char removed, the parts will now be painted red before fitting.

001.thumb.JPG.7e581240848b7aed365b5885319bf5e1.JPG

I have also continued to work on installing the quarterdeck support beams. The aft hatch and associated parts (cannons, capstan, pawls, cannon balls, aft ladder and stanchions rigged with 0.5mm natural thread) were fitted prior to fitting the beams above them.

 

003.thumb.JPG.37e36a3151d7570c324da4e845fc3e22.JPG

 

002.thumb.JPG.820b3c61ecaa67c1b55e5c46f79a37a7.JPG

 

I have also dry fitted the midship deck items, as can be seen in the photo below. The chain pump handle bars (fore and aft) and end caps are currently in the paint shop. They have been given a spray with a primer and I'm now waiting for the second coat of black paint to fully dry before they are test fitted. I have not test fitted the cross members to the bitts but will be doing so.

 

004.thumb.JPG.65e8dd498bf1e93d746eb7ec67992405.JPG

 

005.thumb.JPG.7175be53a8ece73dfb73a3d720a65e4e.JPG

 

Edited by glennard2523

Glenn (UK)

Link to comment
Share on other sites

Hi Glenn, you're progressing nicely, and everything is looking great!

Rusty

"So Long For Now" B) 

 

Current Builds: Speedwell

 

 

Completed Build Logs:  HMS Winchelsea 1/48   Duchess of Kingston USF Confederacy , US Brig Syren , Triton Cross Section , Bomb Vessel Cross SectionCutter CheerfulQueen Anne Barge, Medway Longboat

 

Completed Build Gallery: Brig Syren , 1870 Mississippi Riverboat , 1949 Chris-Craft 19' Runabout

 

Link to comment
Share on other sites

Quarterdeck Support Beams and Deck Items

I started off by gluing the main mast support disc to the gun deck,  the main mast dowel was used to check the position.

001.thumb.JPG.ee1f052129579c912512600708b09249.JPG

 

I then did a trial fit of the chain pump assembly items. No problems were encountered.

002.thumb.JPG.0595d0bab72fcce38902c38e960923e0.JPG

 

I completed the installation of the hanging knees for the midship walkway deck. Although not shown on the photo below I have also added the wooden cleats (2 per side).

003.thumb.JPG.0d480b756b8dc42293ba655c77d484ad.JPG

 

Now that everything has been trial fitted it was time to glue the various deck items in place. The final installation went very smoothly. The completed areas have been coated with a  varnish / white spirit solution. The final three quarterdeck support beams when then added.

 

The hand pump dowels are missing a coat of varnish, this will be added when the remain areas of the completed gundeck are varnished.

004.thumb.JPG.ee25689ddfe205789b0b6891ef7d8dbf.JPG

 

005.thumb.JPG.d0d9ae1c5e6de244db5fada831f351be.JPG

 

006.thumb.JPG.f89cbbc3818040fbbc69e190cafabf7a.JPG

 

The sphinx is ready to have the quarterdeck installed, but I will complete all the work on the gundeck before moving on the the quarterdeck work.

007.thumb.JPG.b7e2c7c656f6cd1d8e4a8de64794fd87.JPG

 

I am now turning my attention to the deck items required for the bow section of the gun deck. I thought it would be prudent to recheck the bitts and foremast would still fully locate in the slots on the lower deck and thankfully everything still fits.

008.thumb.JPG.0f38754188e815d31bf9dbeb009df649.JPG

 

I did a trial fit of the forecastle deck beams. I encountered a slight problem with the alignment of the two forecastle beam carlings when they were fully engaged in their respective locating slot, I had no such issue with my V1 build. I believe I have a solution to the problem but I will put on the back burner until after I have completed adding the remaining gun deck items, as this will help ensure the deck beams are correctly positioned. My next task will be building the following items:

a) Galley stove

b) Galley doors

c) final 8 cannons

Edited by glennard2523

Glenn (UK)

Link to comment
Share on other sites

Bow Area Deck Items

I have completed the basic assembly work on the gundeck items required for the bow area, with the exception of the 8 remaining cannons.

 

I started with removing the laser char from the aft ridings bitts posts and associated cross beam. Next I assembled the gallery door frame and gallery doors. I set the gallery doors slightly ajar when fitting them in the door frames. The stove was a nice little item to build comprising a wooden frame which is then encased with some PE parts. The chain pully is affixed to the stove with 2 lengths of brass rods. I used 0.8mm brass rods as the locating holes in the chain pully and chain pully inner & outer discs were much too small for a 1mm brass rod detailed in the build manual. Finally I removed the laser char from the ridding bitts knees. The items were then trial fitted to the deck, as shown in the photo below noting the wooden stove base still requires to be painted.

 

001.thumb.JPG.dbec12872a07a6d4302a73f23d8b195d.JPG

 

Next I removed the laser char from the fore ridings bitts posts and supports, the bowsprit support and the fore jeer bitts. These items were then trial fitted. The following two photos show the bow area of the gundeck with the deck items all dry fitted.

002.thumb.JPG.a2b5d91899049b0126722385da93c9fc.JPG

 

003.thumb.JPG.8d4ca60e2d892bd4a310e25ed423dfbc.JPG

 

Before gluing the deck items in place I needed to check the forecastle deck support beams and carlings. It would seem everything is a good fit, noting I will need to remove the laser char from the top edges of the forecastle deck support beams and carlings.

004.thumb.JPG.d5f093e8cda662c36c42527f14f13e8c.JPG

 

 

Glenn (UK)

Link to comment
Share on other sites

More Deck Work - Cannon, Bowsprit, Quarterdeck and Forecastle Deck

The remaining 8 cannons have now been assembled. I have added them to the deck in the following two pictures, but they have not glued in place for the time being.

 

Closeup of one side, the two wooden cleats can also be seen as can the walkway deck hanging knees

001.thumb.JPG.cb57e6673282d118de1e442aa7bb95b4.JPG

 

The Sphinx guns are ready and waiting to fire a broadside to any enemy ship

002.thumb.JPG.4ed29a45154d20d9e992c72822b0b21d.JPG

 

I then decided to check the fitting of the bowsprit dowel. Initially the dowel would not fit through the access hole at the front of the bow. This was to be expected as the build manual did show the hole being enlarged. I used a large round file to gradually open up the hole. After a few minutes work the dowel passed smoothly through the hole and through the hole on the bulkhead. I did camphor the bottom edge of the bowsprit support to complete the process.

 

A close up of the bowsprit dowel located through the hull, bulkhead and support

003.thumb.JPG.4c417e0063bdb4f6bf329e1495d55665.JPG

 

A photo showing the bow area, noting all the deck items are still dry fitted at this stage.

004.thumb.JPG.2beb7bdb9e28964bb0c5b8faad0230f6.JPG

 

I have ordered some brick red paint for the stove base which will probably arrive on Tuesday. I already have a grey wash for the tile edges. Therefore my next task will be to remove the laser char from the forecastle deck support beams and carlings. However before I start this task I decided to test fit the quarterdeck. I was very pleased that the deck was a perfect fit. The mizzen mast and capstan dowels were also test fitted without any problems.

005.thumb.JPG.2118d79cd75bbfb0b097d8c1ec9f2549.JPG

 

Using the "unplanked" forecastle deck I did a dry fit. Generally it would appear to be a good fit but it will require a little bit of sanding in a couple of places. The foremast and stove chimney could be positioned without any issues. Once the forecastle deck support framework has been installed I will use the  "unplanked" forecastle deck as a template, and once I am happy with how it fits it will used with ensuring the "planked" forecastle deck is a good fit before it is installed.

006.thumb.JPG.b8132f4ebe81655c49f8b88dbcfff911.JPG

Edited by glennard2523

Glenn (UK)

Link to comment
Share on other sites

Quarterdeck work

I started today with a few simple assembly tasks starting with the belfry required for the forecastle deck. The belfry knees and handle have not been added as yet.

001.thumb.JPG.fa7eea32d29d39498a05c283ec14fabb.JPG

 

I then moved on and built the binnacle and ships wheel. The brass binnacle chimney part has not been fitted as it currently in the paint shop where it has had coat of primer and a coat of black paint. After a trial fit I went ahead and glued the quarterdeck in place. Once the glue had cured I placed the various deck items in place, dry fitting only at this stage. I have also test fitted the various cleats in the stern fascia panel and inner bulwarks. The two holes required for the two lanterns have also been drilled through and then checked that the brass rod will pass through.

002.thumb.JPG.fc936834033cd162e0dd943c17a2e734.JPG

 

Close  up of mizzen mast, ships wheel and binnacle

004.thumb.JPG.6ec86a8d66f354a6c6ceaa3154ac641e.JPG

 

Close up of capstan

005.thumb.JPG.93a785b441bf13d554f30a2a26ae63bd.JPG

 

Capstan and coamings.

006.thumb.JPG.457e376592754e7cc779766ada93a2c5.JPG

 

In the final picture of this post I have added the inner bulwarks, noting they are not glued as I need to sand flat the removed bulkhead tabs

003.thumb.JPG.ff2b74f25cbe7e5247bca68cc95c849f.JPG

Glenn (UK)

Link to comment
Share on other sites

Quarterdeck Work

I have made quite a bit of progress with the quarterdeck. The inner bulwarks have been fitted and painted. The various cleats, eyebolts, flag holder, etc. have been fitted. I have also added the grating assembly (ladders still to be added), ship's wheel, binnacle and capstan. I decided to leave the capstan in it's natural state.

 

The top of the bulwarks have been filed and sanded in readiness for the gunwales. There is a few more tasks to complete, such as adding the quarterdeck rail assembly to the front edge of the quarterdeck.

 

001.thumb.JPG.40b57f6282b8653ccb9112c01a6a3162.JPG

 

002.thumb.JPG.a383be00f36b1294a761dca1ece556cc.JPG

 

With regards to the stern fascia I opted to leave it with the natural pear wood finish but painted the transom knees and both stern ensign staff brackets red.

003.thumb.JPG.1267d800556374b1e099371d86fe5292.JPG

 

I have also built and test fitted the two walkway decks. I did cut a section out of each walkway, as detailed in the build manual, for the gunwales. In the photo below the walkway and associated gunwale have been dry fitted. These will be added once the forecastle deck has been fitted. The brick red paint I ordered for the stove base is out for delivery and will arrive later today, so I hope to be in a position to start work on fitting the forecastle deck later this week.

 

004.thumb.JPG.58a8c44ac8b9f85e46387c0542387902.JPG

 

 

Edited by glennard2523

Glenn (UK)

Link to comment
Share on other sites

This post is going to cover two different areas of the build, the quarterdeck breast rail assembly and the work on the bow area of the gundeck under in preparation for adding the forecastle deck.

 

Quarterdeck Breast Rail Assembly

The quarterdeck rail assembly comprises 4 rails (bottom, middle and 2 top rails), 6 breast rail stanchions and 5 hammock crane supports. The four rails were painted black before the installation phase.

001.thumb.JPG.ebae6e8c85e768c42e3396e2dffb8e3a.JPG

 

The centre section of each breast rail stanchion requires rounding. I used a thin Florey sanding stick and some sandpaper to complete this task. I did add a letter identifier to each stanchion so they could be installed in the correct place.

002.thumb.JPG.0e93921abef19f7800e1ca570d888d0d.JPG

 

When the bottom rail was added to the quarterdeck I used the hammock cranes to ensure the rail was correctly positioned. A couple of clamps were also used to bend and hold the rail in place as the glue cured.

003.thumb.JPG.ee2e74855bd12c46c1b06b009db7c1b9.JPG

 

Once the bottom rail was secure the stanchions and middle rail were glued in place. The top rail was dry fitted to ensure the stanchion were correctly aligned. The tops of the stanchion require a bit more black paint before the top two rails can be glued in place.

005.thumb.JPG.16ab17c62114bfa42764dcdbb924150a.JPG

 

Bow Area Gundeck Work

The various deck items that reside under the forecastle deck were glued in place. The bowsprit and foremast were also test fitted to double check they would fully locate in the slots provided.

006.thumb.JPG.a55d8246181f3b21aaa4309d81b5a8ea.JPG

 

The remaining 8 cannons, 4 per side were glued in place.

007.thumb.JPG.21dae1349d7052062f568191035d24be.JPG

 

The two ropes for the anchors were fed through the hawse holes and forward bulkhead. The rope ends were tied off to prevent them being pulled back out.

008.thumb.JPG.abd78d59694466dbbb2aba09c19d5031.JPG

 

The forecastle deck support beams were glued in place. I did have one or two issues, mainly with the z beam joint with the longitudinal deck beam and gallery door frame. However what happens under the forecastle deck remains unseen under the forecastle deck but I was able to resolve the issues and the forecastle deck was dry fitted without any issues. The foremast, bitts and stove chimney were also dry fitted to ensure there were no alignment problems.

009.thumb.JPG.6af9cc7c95d9998db9d54977cc578a86.JPG

 

The ships belfry was dry fitted for a photo opportunity, noting it is not sitting fully in the slots in the photo below

010.thumb.JPG.cc2fd48b6e674414c9b33fbceb951069.JPG

 

Finally a nice shot of the hull with masts and bowsprit in place and anchor ropes in place. The items on the quarterdeck and forecastle deck can be seen

011.thumb.JPG.a9e69eca513198700b2c196c4b496e51.JPG

 

Glenn (UK)

Link to comment
Share on other sites

Forecastle Deck

The forecastle deck has now been glued to the support beams. I was really happy with the end result. I have also dry fitted all the deck items and everything seems to be a good fit. The belfry assembly has been painted black. The forecastle breast rails / knees have been assembled but they have to be painted black before they can be glued in place. The coaming / grating assembly has had the laser char removed and is now ready to be glued in place. The two foremast bitts have been glued in place but the two crossbeams are only dry fitted as I will need to check the belaying pin fit before they can glued in place. My next task will be to add the inner bulwarks and deck iron work before moving on to adding the two walkway decks.

001.thumb.JPG.c59faebf8a9babcdb18176da3d5a2b51.JPG

 

002.thumb.JPG.cb9d1a2342aff7ae3b50bf753764dc24.JPG

 

I also completed the work on the quarterdeck breast rail assembly. The hammock cranes rigging will be done once all the deck work has been completed.

003.thumb.JPG.7990133052fd6e95ec7cdbfe651ed8d7.JPG

 

This is a nice view of the three decks.

005.thumb.JPG.954e4c6b57bacc378a141650c9c2edcf.JPG

 

006.thumb.JPG.af1a977fd1c57a0ef209d1a6ce9e3338.JPG

 

Glenn (UK)

Link to comment
Share on other sites

Catheads

I did not have too much time to spend in the shipyard today. The forecastle inner bulwarks had been soaked and clamped to the hull last night prior to fitting. Before fitting them I decide it would be a good idea to assemble and test fit the catheads. The assembly of the catheads was a simple task. The access slot for the catheads through the hull does require opening up however. In the build manual this was done after the inner bulwarks and gunwales had been fitted. I thought it might be a bit easier to open up the hull for the catheads before the inner bulwarks and gunwales were fitted. The bulwarks could then be worked on before fitting.

 

I started by placing the cathead on top of the hull, centrally to the pre-marked cutout for the catheads, and made two pencil marks. I carefully removed the excess wood, using some tape to protect the forecastle deck. I took my time with this task, checking the fit of the cathead several times. Once I was happy with the cutout I clamped the inner bulwark to the hull and marked where the excess material needed to be removed. Once again I took my time with repeated checks. It might not be the best method but it certainly worked well for me.

 

The following photo was after I had started work on opening up the inner bulwark which had then been clamped in place for a fit check. The outer hull will require a little bit of paint touch up.

001.thumb.JPG.036b36a871d869a637926f840595daab.JPG

 

A little bit more work is required on the inner bulwark as the cathead is not quite sitting flush on the deck

002.thumb.JPG.63fd1a3db95ecb75e866ca725d4d7335.JPG

 

IN the next picture I am checking the fit with the gunwale clamped in place, all looks good.

003.thumb.JPG.34fa0c7c0b4b45120c5ea296cf9e50b4.JPG

 

The cathead is now sitting flush on the deck.

004.thumb.JPG.cc2d686d95f4b5422bc9424846097a92.JPG

 

I will need to open up the cathead holes on the finishing inner bulwark patterns also.

 

My best guess estimate is that I will complete all the hull work in the next 2 to 4 weeks. I will then move to manufacturing the bowsprit, masts and yards. I also have the three small boats to build. Exciting times ahead.

Glenn (UK)

Link to comment
Share on other sites

Decks

The forecastle deck work is now completed, with the exception of adding the eyebolts, belaying pins and gunwales complete with timberheads and hammock cranes.

 

The gunwales have been painted black and are ready to be secured in place. I plan to dry fit the timber heads prior to securing the gunwales in place just to make sure there are no unforeseen installation problems.

 

As can be seen in the photo below I painted the catheads and cathead knees black but opted to paint the front pattern gold.

001.thumb.JPG.7071be45bf44f8ef6da7310752bcfb56.JPG

 

The forecastle breast rail assembly was a great fit, as was the belfry. When fitting the breast rail one of the knees, when coated with glue sprung away from my pliers. I spend a fun 20 minutes searching everywhere for the missing knee which I eventually found it in a dish where I keep the all the unused cut-outs from the various decks. The dish is kept on the window ledge next to my workbench so it was an amazing leap for the knee to end up there! The more eagled eyed will also spot the walkway does dip down a little in this photo. There is not a lot I can do about that now but once the Sphinx is fully rigged I am sure will not be noticed.

002.thumb.JPG.d98b6975552e23f1927435a0e98ba4da.JPG

 

The two walkways have been added as have the two steps to the quarterdeck and ladders from gundeck up to the walkways. I should have trimmed the width of the two steps so they were the same width as the walkway - oops!

003.thumb.JPG.ca1d5f8177ee5d848a1e2f0aaefce584.JPG

 

All the gunwales have been painted black and test fitted. They are shown in the following three photo's but they are only placed in position and are waiting to be glued in place which will explain the gapping that can be seen.

007.thumb.JPG.bed15f09d1521de73599b4214ae8c7e7.JPG

 

A slightly out of focus full length shot of the current build status 

005.thumb.JPG.a848f27c8acfa88511735a817f2b3c2a.JPG

 

 

006.thumb.JPG.65b82e776b54f2f8049e6d9ccabf56a9.JPG

 

 

 

 

004.JPG

Edited by glennard2523

Glenn (UK)

Link to comment
Share on other sites

Deck Work - Nearing Completion

I have made good progress over the last couple days and the work on completing the decks and hull is almost complete. I have attached three photo's of the current state of my Sphinx V2 build. I will then provide a bit more detail of the various bits added later on in this post.

001.thumb.JPG.00e4c869a5b060727d4724a28f1165cb.JPG

 

002.thumb.JPG.b140602cff8dbfd2982bf8d419fc04f2.JPG

 

003.thumb.JPG.efd65cb9a485189511306c8eacc0c10b.JPG

 

The gunwales were glued in place followed by adding the timberheads and fife rail supports for the quarterdeck. I lined the various timberheads and fife rail supports in the correct order on my workbench and then dry fitted them to the gunwales. With everything in place the slots of the underside of the fife rail slots were then checked with the position of the supports on the gunwale. With everything looking good I proceeded to glued the parts in place. I noticed the kit does have a set of hammock cranes for the quarterdeck section, which are shown on the plan sheets. It does not appear these were fitted on the prototype.  I opted to follow suit.

 

Picture of the fife rail and timberheads. I did not fill the pin locating holes after assembling the fife rail

004.thumb.JPG.03c0ff48c1e403eb2d5d503ce04e4a8f.JPG

 

The quarterdeck breast rail assembly was then completed with adding the two stanchions to the walkway deck, the support bracket to link the stanchions with the breast rail assembly and the two hand rails down to the walkway deck. I used 0.5mm black thread to rig the hammock cranes.

 

005.thumb.JPG.a9f32da7ca69d9f12edc3390780eeaa5.JPG

 

I then built the two bow main rails and rounded the top section as detailed in the build manual. I did manage to break the top parts of both main bow rail assemblies  but thankfully I was able to repair them both before they were glued in place. I am not totally happy with how they sit against the side of the hull but they do sit flush with the sides of the bow grating deck which was my main aim when fitting them in place.

006.thumb.JPG.9f9fd610f6e1cdb9bc29a803a8004fd1.JPG

 

The timberheads, hammock cranes and eyebolts were added to the forecastle and walkway gunwales and then they were rigged using 0.5mm black thread.007.thumb.JPG.ddb0f811604f9be713a3594d85cdefc4.JPG

 

The final items added to the Sphinx were the two seats of comfort to the bow grating deck and the two PE hull decorations which sit either side of the stem post beneath the bow grating deck.

008.thumb.JPG.11242a2a0a4717e5ad156f781b6a72ba.JPG

 

I have started work on the two lanterns, I am currently painting the resin parts. I also have the 6 off gun port lids to build which will be my next task. I also need to add rudder chain. Once all that is done I can either start work on making all the yards and masts or I can try building the small boats. I suspect I will split my time between mask/ yard fabrication and small boat building. I think the small boat build will be quite a challenge for me.

 

Glenn (UK)

Link to comment
Share on other sites

Looking at your lovely build, and especially the wonderful close-up of the heads, led me to follow a line of thought about the seats of ease (yes I know I can be accused of an unhealthy interest!).  I wondered about how precarious it would be for a sailor to perch on one of those in a strong wind and with waves breaking over the bows.  There must have been something to hold onto - perhaps a rail or at least some ropes somewhere.  I looked up Lavery's "Arming and Fitting . . . ", where he has a section on heads and ablutions generally.  He remarks on the exposed nature of the heads, especaily on a small ship, but the only suggestion of a device to improve safety is a design for a seat of ease shaped like a throne with arm rests.  Could this be where the English slang term for a toilet - the "throne" - came from?!

 

Nipper

Current build:  HMS Sphinx 1775 - 1/64 - Vanguard Models

Completed build:  HM Cutter Alert 1777 - 1/64 - Vanguard Models

Link to comment
Share on other sites

1 hour ago, Nipper said:

Looking at your lovely build, and especially the wonderful close-up of the heads, led me to follow a line of thought about the seats of ease (yes I know I can be accused of an unhealthy interest!).  I wondered about how precarious it would be for a sailor to perch on one of those in a strong wind and with waves breaking over the bows.  There must have been something to hold onto - perhaps a rail or at least some ropes somewhere.  I looked up Lavery's "Arming and Fitting . . . ", where he has a section on heads and ablutions generally.  He remarks on the exposed nature of the heads, especaily on a small ship, but the only suggestion of a device to improve safety is a design for a seat of ease shaped like a throne with arm rests.  Could this be where the English slang term for a toilet - the "throne" - came from?!

 

Nipper

It certainly where the term "heads" comes from. Throne comes from Louis XIV who would continue to conduct his royal duties whilst sat on the toilet, which became known as the Throne room

Edited by glennard2523

Glenn (UK)

Link to comment
Share on other sites

Thinking a bit further about safety at the heads:  when I reach this point with my Sphinx I might put in some kind of rail - maybe a couple of stanchions and some rope.  But I'll do some more research first to see what I can find out . . .

Current build:  HMS Sphinx 1775 - 1/64 - Vanguard Models

Completed build:  HM Cutter Alert 1777 - 1/64 - Vanguard Models

Link to comment
Share on other sites

2 hours ago, Nipper said:

Thinking a bit further about safety at the heads:  when I reach this point with my Sphinx I might put in some kind of rail - maybe a couple of stanchions and some rope.  But I'll do some more research first to see what I can find out . . .

I hope you'll do a log on your build.  The more, the merrier.

Mark
"The shipwright is slow, but the wood is patient." - me

Current Build:                                                                                             
Past Builds:
 La Belle Poule 1765 - French Frigate from ANCRE plans - ON HOLD           Triton Cross-Section   

 NRG Hallf Hull Planking Kit                                                                            HMS Sphinx 1775 - Vanguard Models - 1:64               

 

Non-Ship Model:                                                                                         On hold, maybe forever:           

CH-53 Sikorsky - 1:48 - Revell - Completed                                                   Licorne - 1755 from Hahn Plans (Scratch) Version 2.0 (Abandoned)         

         

                                                                                                                                                                                                                                                                                                

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...