Jump to content

James H

Administrators
  • Posts

    5,613
  • Joined

  • Last visited

Posts posted by James H

  1. 1 hour ago, Canute said:

    I think people shy away from Gorilla, expecting the expanding foam variety. They make a very nice PVA glue which I've used from time to time. Haven't tried their CA glue. Been looking at the rubber particle filled CAs for their added strength.

     

    I use Gorilla CA gel all the time. It's all I'll ever now use (of all CA brands) for constructional stuff, when I'm not on Titebond. 

  2. ....continued.

     

    Now, those laser cut rails. These are now glued into the engraved positions on the outer bulwarks. Some extra parts are added to these to create a 3D relief.

    518.jpg

    519.jpg

    522.jpg

    523.jpg

    524.jpg

    525.jpg

     

     

     

     

    What we believe is the remainder of the original second wale from her 64-gun days, is now fitted. The position of this is crucial. Here you see the area around it masked off and the wale sanded.  

    528.jpg

     

     

     

     

    The timber which is obstructing the gun port is now carefully snipped away and sanded flush with the gun port edges.

    533.jpg

     

     

     

    More gunwale position levelling, and the parts finally glued into place.

    534.jpg

    539.jpg

    541.jpg

     

     

     

    The gun port positions on the forecastle gunwale are also prepared.

    542.jpg

     

     

     

     

    Now it's the turn of adding rails to the stern of this beast. These are all laser cut and engraved. All you need to do is to make sure you fit them all in alignment. 

    545.jpg

    546.jpg

    552.jpg

     

     

     

     

    At this point, I glue in the second set of foremast bitts.

    553.jpg

     

     

     

     

    And here is Indy so far.

    554.jpg

     

     

     

    I have actually done more than this in preparing other assemblies, such as binnacle, ship's wheel, catheads etc. At this point, it's not long off adding some colour to this hull.

  3. This update concerns fitting the inner bulwarks, finishing off the stern (for the moment) and fitting rails, gunwales etc. 

     

    I alway find snipping and sanding away the last vestige of visible MDF from the model, to be very satisfying. This being the removal of the bulkhead ears above deck. Sandpaper is then used to properly level them.

     

    484.jpg

    485.jpg

     

     

     

     

    As this model is being fitted with the optional maple deck, test fitting and trimming that is the next task. Finally, this is carefully glued into place, checking alignment as I go. Plenty of 2-inch clamps are used to make sure the whole surface is in contact around the various openings.

    487.jpg

    489.jpg

     

     

     

     

    Before the forecastle maple deck can be added, I need to fit the foremast bitts. This is fitted at this stage to allow the lower ply sub deck to be fitted. This is now slotted through the deck beam frames and then the small deck section slotted and glues over it. With that in place, the maple deck can then be fitted. Deck test fitting is of course done before fitting the bitts.

    491.jpg

     

    493.jpg

    494.jpg

     

     

     

     

    Lastly, the gangway maple deck section are glued into position.

    495.jpg

     

     

     

    With the deck sections fitted, the inner bulwarks are painted in red and fitted. The forecastle ones were first soaked and clamped to shape before working with them. 

    501.jpg

    504.jpg

     

     

     

    More gun port tidy up now, using the same homemade sanders I used for the main gun deck.

    511.jpg

     

     

     

     

    At this point, I needed to fit some of the external details, such as rails etc. These are a combination of strip timber and pre-cut parts. Firstly, a 1mm² strip is glued to the edge of a 3mm² strip, left to dray and the edges subtly rounded. The rail is then fitted at a position equidistant from the wale below it. 

    512.jpg

    513b.jpg

     

     

     

     

    A 12-inch steel rule is now wrapped in sandpaper and used to level the gunwale positions for later.

    514.jpg

     

  4. 5 hours ago, Vane said:

    I would suggest that the Moderators clean up the last pages of this thread with all the "when is the next update?", "any news?"-discussions. I know everyone WANTS to hear news but asking about it doesnt make it faster... Considering how active Jim is on this forum, I am sure we will be the first to know when there are any news. It is kind of clear that this kit has been delayed until further notice.    

     

    Ok, this topic has been pruned of around 30 posts that were asking status, and those trying to explain things. 

     

    When I have news on this project, then here is where I'll post it. If there is no post, then I have no news, so please don't keep enquiring. ;) 

  5. Hi Glenn,

     

    Those sides needed fairing in far more before you added the bulwarks. Sanding needs to be done to fair the MDF into the deck edge at the rear, and that will also bevel those stern timbers, possibly by half. Take a look at my pics. Also, that lower counter needed sanding into the hull. Check out the subsequent pics in manual. You need to ensure the lines of the hull flow and you have maximum bulwark contact to the timbers.

     

    Screenshot%202022-10-09%20at%2011.49.16.jpg

    Screenshot%202022-10-09%20at%2011.49.43.jpg

  6. Before I glue the roof into place, it needs to be tested against the gallery once the outer skins are added. 

     

    473.jpg

     

     

     

     

    WIth those glued into place, the roof is finally trimmed to size and also glued to the model.

    475.jpg

     

     

     

    On top of that is the pear cap which will slightly overlap the shingles that will later be fitted. The pear parts that make the lower galleries are now shaped and fitted.

    478.jpg

     

     

     

     

    Time to fit the outer stern panel and quarters. I highly recommend you use CA for this so there's no curling of the parts.

    479.jpg

     

     

     

     

    These are then shaped and the gallery/stern area given a finishing sanding to even up all edges etc.

    480.jpg

     

     

     

    And lastly, the engraved upper stern is fitted and then also sanded into the rest of the hull. 

    481.jpg

    483.jpg

     

     

     

     

    More next time...

  7. Another update as at least it's now looking a little different. 

     

    Well, like it or not, the cabin areas now have to be decked over and here you see the beams in the fore cabin area, including the timbers for the original position of the skylight. This was likely moved rearwards when razed.

     

    457.jpg

     

     

     

    And here you see the new skylight position over the main cabin, which sort of does make much more sense as that area can now be subject to some direct down sunlight. 

    461.jpg

     

     

     

     

    With all beams in place, the 0.8mm laser-engraved ply sub-deck is now installed, notched into the protruding bulkhead ears that you can see.

    463.jpg

     

     

     

    With the poop deck now installed, it's time to turn attention to the quarter galleries. This always gives a hull some character and definition. Here you see the frames, now painted, being glued to the indents on the rear of the hull sides.

    464.jpg

     

     

     

    The inner stern panel can now be fitted, as well as the counter. 

    465.jpg

     

     

     

    As with Sphinx, the quarters are sheathed in two layers of timber with the upper parts creating a recessed frame. Here are the inner skins for the galleries.

    466.jpg

    468.jpg

     

     

     

    And here is the stern up to this point.

    469.jpg

     

     

     

    Three MDF layers are used to create the roof, except for a pear caping piece that's fitted soon. These will eventually be painted black and covered with laser-cut shingles. The reason for the layers is that it makes it easier to sand to the correct angles as you temporarily sit them on the hull side.

    471.jpg

     

     

     

    After fettling, the finished roof will look like this.

    472.jpg

  8. The comparison of the engraved deck to the ply sub deck is correct. The engraved part is smaller as it doesn't extend into the bulwark area.

     

    The problem you have with fitting the ply decks is definitely that the halves aren't pushed completely back into the slots in the bulkhead ears, no doubt. The deck width across each bulkhead I a set width, with zero variation between kit. 

     

    Try using a jewellers file to remove the char from each ply deck slot, and also slightly bevel the upper, innermost part of the slot so that it catches the notch in each bulkhead ear. I absolutely guarantee that this is the cause. I've seen this a couple of times before and know this is the issue. Just be careful in your test fitting to make sure the deck halves are slotted in 100%.

  9. 1 hour ago, yvesvidal said:

     

    Nobody will want to build the quarter deck and hide this beautiful cabin from the view. Maybe Chris will design a removable deck to show the interior....

     

    Yves

    It'll be a little difficult on a fully rigged ship. 

     

    You can open things up more if you wanted though. 

×
×
  • Create New...