Jump to content

Recommended Posts

Posted

Very nice work Ben!

Rusty

"So Long For Now" B) 

 

Current Builds: Speedwell

 

 

Completed Build Logs:  HMS Winchelsea 1/48   Duchess of Kingston USF Confederacy , US Brig Syren , Triton Cross Section , Bomb Vessel Cross SectionCutter CheerfulQueen Anne Barge, Medway Longboat

 

Completed Build Gallery: Brig Syren , 1870 Mississippi Riverboat , 1949 Chris-Craft 19' Runabout

 

  • 2 weeks later...
Posted

Thanks for all the likes and nice comments.

 

I’m making good progress on the QD beams and knees, all the way down to where I now have to start fitting the chain pumps in place.

The pumps were built as per the instructions without much issue along with the Capstans, columns, Main Jeer Bitts and Gallows.

 

Lets see how this final part of chapter 7 goes!

IMG_6867.thumb.jpeg.95fbf3c682459fe3fa1dd7fc6f7fe3dd.jpeg

IMG_6870.thumb.jpeg.50e7f9700479826f081899a754815269.jpegIMG_6869.thumb.jpeg.a38573f4a5fad2f4621e62ff905226c0.jpegIMG_6868.thumb.jpeg.32c09edf3163090af8d556d6a8d735fe.jpeg

Posted

Completed Chapter 7 with the completion of the Chain pumps and their associated cranks.

I won’t install the elm tree pumps until much later as I’m bound to knock them off.

Just a little bit of sanding to do on the QD beams and knees to flatten them down for their margin planks and then to install the QD carlings.

 

IMG_6873.thumb.jpeg.1acb5aec410e5c4c551581e8b9e735d4.jpeg

Posted
On 1/5/2020 at 1:32 PM, Trussben said:

I have completed the keel and started glueing the bulkheads together, here you can see them sat in place.

 

ben

CAE24BF9-A708-48E4-899D-D166B3DCA317.jpeg

Did you glue all your bulkheads onto keel before you removed the char?

Posted (edited)
20 hours ago, woodartist said:

Did you glue all your bulkheads onto keel before you removed the char?

Yes I certainly did, glue the bulkheads and maybe spacers between them all in place before going near it with sandpaper, you will do that when you "fair" them roughly before adding the gunport cills.

Edited by Trussben
Posted
On 8/1/2024 at 11:35 AM, woodartist said:

Did you glue all your bulkheads

Look back at many logs, you’ll find fairing is one of the most challenging and crucial steps of your build. It defines all that comes after. In this case the char actually helps as a guide. 

Regards,

Glenn

 

Current Build: Don't know yet.
Completed Builds: HMS Winchelsea HM Flirt (paused) HM Cutter CheerfulLady NelsonAmati HMS Vanguard,  
HMS Pegasus, Fair American, HM Granado, HM Pickle, AVS, Pride of Baltimore, Bluenose

Posted

As beautiful and precise as ever. It's a real pleasure to see this work moving forward! Thanks for sharing.

Jean-Paul

 

'You are not carving a bear with a chain saw here folks',

Chuck Passaro, ´Queen Anne Style Barge´ manual of instructions

 

Current builds :

 

Finished build :

 

Next on list :

  • HMS Winchelsea 1764 - Syren Ship Model - 1:48
Posted

Chapter 8 has been completed, just a little sanding of the deck beams and knees when I start planking to get a nice run.

 

I still haven’t added the cannons in the waist yet as want to keep them out of the way as long as possible so I don’t knock them loose with an errant elbow.

 

IMG_6913.thumb.jpeg.fe062292b4bd0882f565662a6dada523.jpeg
IMG_6910.thumb.jpeg.05388f743ee6ff3e96c11950132cc628.jpegIMG_6911.thumb.jpeg.ff92bd159c5172fa2d10c10b64e9130b.jpegIMG_6909.thumb.jpeg.518744b3efc73a2fe5e457a6cb1bafee.jpegIMG_6912.thumb.jpeg.c651e2e7270f0ed1f4bb5951dc068bbc.jpeg

Posted

Well done! Like you my elm tree pumps and waist cannon weren't installed until the end of Chapter 11.  Your wood selection and paint choices, not to mention the framing cutout, make yours unique with lots of visual appeal.

 

Regards,

Glenn

 

Current Build: Don't know yet.
Completed Builds: HMS Winchelsea HM Flirt (paused) HM Cutter CheerfulLady NelsonAmati HMS Vanguard,  
HMS Pegasus, Fair American, HM Granado, HM Pickle, AVS, Pride of Baltimore, Bluenose

  • 2 weeks later...
Posted

Chapter 9 is well under way with the QD and FC side plates to cover the last of the framing done, Caprails installed and the QD planking half completed.

There will be lots of paint touchups that will need to be done and small gaps filled when the planking is completed.

 

IMG_6946.thumb.jpeg.a1f707aea469e3d8af51b272d56e2213.jpeg
IMG_6945.thumb.jpeg.a0dc3fdfc91fbefaa3df02ca79663380.jpeg
IMG_6944.thumb.jpeg.baf67007febca0409b16fca07f0fed4d.jpeg
IMG_6943.thumb.jpeg.dfb73bd29101ede42cdcc6c4f40c9214.jpeg

  • 2 weeks later...
Posted (edited)

Center planking on both QD and FC completed ( did not put the notches around the scuttles on the QD - prefer the look ) and I started the gangways, I want to finish most of the inboard details before I begin the railings to avoid damaging them.

IMG_7002.thumb.jpeg.1e42a957e4a255887ddb3236fe7de59a.jpegIMG_7004.thumb.jpeg.0ac4b4075106a74b1bbeeb3a13c451a4.jpegIMG_7001.thumb.jpeg.cde3b7ff081ea68b2ab78eb2a4a2cadd.jpegIMG_7006.thumb.jpeg.30af31e953dbd11963658f709eebc1d3.jpeg

Edited by Trussben
  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...