Jump to content

captain_hook

Members
  • Posts

    675
  • Joined

  • Last visited

Posts posted by captain_hook

  1. Thank you very much. I glued the guns in place. First I drilled a hole through the front axle, pinned that with a short 0,7mm nail (so that the nail is only about 0,5mm longer than the bottom of the front wheels) and positioned the gun in place. Pressed it down until the nail in the axle marked a spot on deck and drilled a hole into the spot through the deck. Then glued a longer pin into the axle and that into the predrilled hole on deck. Positioned until it has the correct angle. Epoxy gives a lot of time for correcting the angle. Next is gluing the eyebolds.

    E10CC0D9-C290-46E1-92DF-CBCB247DD639.jpeg

    FC96B313-F65E-4314-A13B-B1CF5405A776.jpeg

    1241D79E-DDA2-4C39-B1C1-8F48315417E9.jpeg

  2. Added the stop chocks. This completes the boom except for the heel lashing and the footropes which will be done with the rest of the rigging later. Next is installing the guns. I think about a way to store some cannonballs. Maybe I add some sort of rack or sheet beside each gun storing 5 cannonballs. 

    EE852DA5-E7FE-4BF2-BB89-794A3D65B97D.jpeg

    D39086B5-43EF-457D-8BF5-B4AD292DF3ED.jpeg

    4441F77C-D7FC-4E66-9A9E-10152EC76EE8.jpeg

    1C2DDC9D-BACF-4864-9F7D-5DB2BF18EB4A.jpeg

  3. Thank you very much for the kinds words and the Likes. I took a 4-week break from modeling the AVS to prepare my next project, the H.M. Brig Badger POB in 1:48 scale. Drawn the bulkheads and some parts in Corel Draw to have them lasercut soon. Now it is time to return to the AVS. Installed all iron bands on the bowsprit. 

    8A774EEF-0F35-4037-AA81-A6C152643FFD.jpeg

    AB7AB1EE-9208-4B5D-A943-2E9639E4D32F.jpeg

    084D88FC-B856-4F3E-9CE9-1E660860F950.jpeg

  4. Happy new year 2019! I finished the painting, there is only some clear varnish left. I made two ladders for the cabin front and installed the catheads. The plan shows the catheads installed near the first gunport but a lot of contemporary plans of smaller vessels show catheads installed rather in front of the vessel, so I fitted them between the first two timberheads as I am going to use anchors larger than the kit-supplied ones. Drilled all the holes for clamps and eyebolds. I will install them later this week. All deck items are dry-fitted, nothing is glued yet. I will rig the guns before I install them on deck. 

    76B6C344-BE19-4D67-A688-12B587F046C1.jpeg

    021A1EE9-FA73-450A-8835-9152082E2362.jpeg

    CA0F0258-8A41-4BF9-852C-47DA2E09CEB1.jpeg

    D7D83F4B-AF7D-476B-AD03-17FF40DBEED9.jpeg

    C97518F9-0CB7-40DE-AD98-C5F20D3EB97F.jpeg

  5. I hope everyone had a merry christmas. I prepared the rudder and attached it on the hull using the supplied brass stripes and 0,8mm brass rivets, which I epoxied into the pre-drilled stripes. The glue has to dry 12 hours and the support strips to keep the rudder in place are shown on the photos. 

    9262DC62-0E69-4109-8B1E-BF942625C63B.jpeg

    A62F8D5E-C544-4B90-82ED-7E931B65602E.jpeg

    BD5F3ED1-4E4F-4818-9764-AEC9430C8F13.jpeg

  6. All parts finished except the rudder and the cabin ladders. But the painting of the hull is more difficult than expected, so I cannot access the deck to install the items and to add the eyebolts. Have to paint more thin layers of paint to have some colour to sand flat. Should have used water based acryl instead of emaille. So I have to wait 6 hours before I can add another layer. Next time I will use my airbrush. 😏

  7. Wow, Captain Rathbun was very lucky indeed. But it is nice to have some guns available - in case you need them. I completed the 6 ones for the AVS. I used Syren 1/64 6-pd guns with carriage in exchange for the 1/48 3-pd casting barrels. They look a little thinner than the supplied ones but have equal length. Need to rig them but I have to do some more work on the hull first.

    C2B56057-160F-47F5-880E-18C3C908E727.jpeg

  8. Yesterday I started treenailing the deck. First I used some 2mm tape to line up the holes. Then I used a I pricker to pre-drill the holes. AND THEN I started drilling.......  and more drilling ... and even more. Took me about 4 hours yesterday and another 3 hours to position and drill all the holes by hand. Hard to estimate how long it would last to completely treenail a quarter scale swan class sloop. Used a 0,6mm drill (that would be about 3 cm for a real treenail). Lucky me, no broken drills.

     

    I will start inserting toothpricks tomorrow, because my battery is more than empty for today...... After that I have to paint some areas again.

    ADB279CF-A240-42A6-B0FC-18F0567B131D.jpeg

    E96B6BF4-6AE4-429B-B169-50A5DB82756C.jpeg

    2A099D19-0B11-4372-B7E6-C25DF868E3D6.jpeg

    E921758C-7521-48E2-ADB1-C1C1FCED673A.jpeg

  9. Today I added all stop chocks, the boom jar rest and simulated the Iron bands on the gaff and boom with stripes cut from black card paper. Added some eyelets too. I will paint the masting parts just before I will begin rigging. As the masting material is almost finished I have no more reasons to postpone deck treenailing. Will start with that tomorrow ... or next week. 

    74452DEE-19B6-4A97-AECF-EE80F35E1EDB.jpeg

    C2107E9D-DD71-4C08-88E8-092DE4466E53.jpeg

    54CA7804-5C83-4E20-8A89-124D935D8557.jpeg

×
×
  • Create New...